Project Name: central heating automatic control project of Sinopec Shengli oil field 

Customer Name: Dongying Oilfield Petroleum Administration bureau
 
Implementation Time: September,2010—until now

Project Profile: Dongying shengli oilfield shengzhong thermal company
                         Heating area: 6,000,000 square meters
                         Length of total a pipe network: 64.71km
                         Numbers of heat exchange station:117

Unattended automatic heat exchanger unit, the transformation of the overall heat exchange station automatic control system and SCADA system of heat-supply network.

Project content:

System uses Siemens Desigo Insight 4.0 configuration software, begins in 2010, automatic control transformation and SCADA system access to the original 110 stations, through the whole project set up and reform, make the system has the following functions: real-time screen, real-time alarm, report customization, real-time and historical trends, real-time and historical data, remote control, pressure diagram and open database etc, and also introduce the following measures: security, temperature control, pressure control, replenishment control, energy-saving control etc. Establish energy consumption measure management system and implementation of the whole network control strategy, reasonable distribution of the heating network resources, meet the thermal needs of the user and the maximum extent possible to reduce energy consumption.



Project Name: central heating automatic control project of Sinopec Shengli oil field 

Customer Name: Dongying Oilfield Petroleum Administration bureau
 
Implementation Time: September,2010—until now

Project Profile: Dongying shengli oilfield shengdong thermal company
                         Heating area: 2,700,000 square meters
                         Length of total a pipe network: 43.71km
                         Numbers of heat exchange station:117

Unattended automatic heat exchanger unit, the transformation of the overall heat exchange station automatic control system and SCADA system of heat-supply network.

Project content:

System uses the new PVSS software, all the DCS data of east and west boiler room and 20 heat exchange stations access to PVSS, to achieve unified regulation of boilers-heat exchange stations. The original automatic control of shengdong h&p station is relatively backward, and automatic manufacturers are mixed and disorderly. My company has unified renovation of automatic control to the 20 accessed heat exchange stations, and made  the system has the following functions: real-time screen, real-time alarm, report customization, real-time and historical trends, real-time and historical data, remote control, pressure diagram and open database etc, and also introduced the following measures: security, temperature control, pressure control, replenishment control, energy-saving control etc. Establish energy consumption measure management system and implementation of the whole network control strategy, reasonable distribution of the heating network resources, meet the thermal needs of the user and the maximum extent possible to reduce energy consumption.

2016年03月28日

Sinopec Shengli oilfield district heating automatic control engineering